Thursday, August 9th, 2018 – Wrapping up Deployment

Today marks the last day the Dell and DDN teams will be on site meaning the end of deployment.

After a long day the team was able to complete:

  • Lustre configuration
  • Verified and checked both GPFS and Luster are good to go
  • Have the motherboard was replaced on an additional node.  Updated firmware and reapplied BIOS settings after the replacement was complete.
  • Completed final rack pair Linpack tests.
  • Connected entire cluster to GPFS and Lustre.