Category: Colonial One
Time Lapse Delivery of Colonial One – Loading Dock
July 24th 2018 – Racks Delivered
On Tuesday, July 24, 2018, the Colonial One build project kicked off with the delivery of a total of fourteen racks that will house the new Colonial One environment. Each rack, which was fully loaded with servers, storage housing and other equipment, was placed on a specialized pallet. The equipment came on 2 semi-trucks: with each pallet weighing roughly 1 ton!
Check out the photos below:







